4/14/2017 1:00-4:00 pm: Began working through "Crunchbase Potential Accelerators" textpad that may contain missing accelerators and wrote notes on the ones that I was able to go through. Need to finish this textpad before moving forward.
4/17/2017 1:00-4:00 pm: Continued going through potential Crunchbase accelerators that we may have missed. Talked to Ed about getting a more comprehensive list from Excel file and by the end of the semester have the tables and data collected and done.
[[Matthew Ringheanu]] [[Work Logs]] [[Matthew Ringheanu (Work Log)|(log page)]]
[[Category:Work Log]]