Changes

Jump to navigation Jump to search
288 bytes removed ,  10:43, 26 April 2017
no edit summary
|Has project status=Active
}}
Tentative timeline for six five blog posts to be completed by end of the semester:
Cincinnati: completed and published
St. Louis: completed by 3/24 and sent in the blog, waiting for peer editing. publication
Washington DC: already completedand in the blog, but needs editing (on 3/27). Send waiting for peer editing 3/27. publication
HoustonDenver: complete by 3/30 and send for peer editing. drafting
Chicago: complete by 4/7 and send for peer editing.  Las Vegas: complete by 4/14 and send for peer editing.  Nashville: complete by 4/21 and send for peer editing.  Denver: complete by 4/25 and send for peer editing. drafting
File with cities and accelerators called "City Accelerators Eliza" located in E:\McNair\Projects\Accelerators
==List of Emerging Ecosystems==
*Austin (completed: [[Austin TX Emerging Ecosystems (Blog Post)| Austin, TX: Emerging Ecosystems]])
*Denver(drafting)
*Cincinnati (completed: http://mcnair.bakerinstitute.org/wiki/Cincinnati_Ecosystem)
*Chicago(drafting)
*Las Vegas
*Minneapolis-St. Paul
*St. Louis (in progress: http://mcnair.bakerinstitute.org/wiki/St._Louis:_Emerging_Ecosystemscompleted)
*Kansas City
*Nashville
*San Diego
*Phoenix
*Washington DC (completed but not published)
151

edits

Navigation menu