3/31/2017 1:00-2:00 pm: Ran the code for accelerator urls which are ready to be run through the wayback machine in order to get the start dates. Also began looking through vc backed company names.
4/3/2017 1:00-5:00 pm: Continued looking through double matched VC companies. Learned more SQL from Ed.
[[Matthew Ringheanu]] [[Work Logs]] [[Matthew Ringheanu (Work Log)|(log page)]]
[[Category:Work Log]]