Matthew Ringheanu (Work Log)

From edegan.com
Revision as of 18:57, 10 November 2016 by Mringheanu (talk | contribs)
Jump to navigation Jump to search


10/17/2016 2:00-5:00 pm: Created personal wiki page as well as work log; Read about the research project to which I have been assigned; Wrote a short summary of what I believe it is and included some helpful links

10/18/2016 4:00-6:00 pm: Met with research partner Shrey who filled me in on where we are with the project; Began looking on websites of certain accelerators for how to determine their cohorts and listed these steps on the wiki

10/19/2016 2:00-5:00 pm: Finished looking on the remaining accelerator websites and wrote the steps on determining how to manually locate the cohorts.

10/20/2016 4:00-6:00 pm: Met with Peter and Christy to discuss the possibility of creating a web crawler that will pull data from individual accelerator sites.

10/24/2016 2:00-5:00 pm: Brainstormed with Albert and Julia about changes to the category name for SBDE. Spoke to Ed about full scope of accelerator project.

10/25/2016 4:00-6:00 pm: Brainstormed with Shrey about different potential industry focuses within accelerators, as well as different variables to search for in terms of accelerators, startups, cohorts, etc.

10/26/2016 2:00-5:00 pm: Began searching for more databases including lists of accelerators as well as some characteristics of those accelerators; Began searching for characteristics that identify accelerators on their websites

10/27/2016 4:00-6:00 pm: Continued searching for relevant lists of accelerators to include on our page. Added some links that have high potential under the tab (Obtained from List of Accelerators or various Google searches).

10/31/2016 2:00-5:00 pm: Began constructing a list of variables that clearly distinguish an accelerator on its website. This is in an effort to allow a crawler to crawl through many Google searches and identify accelerators.

11/1/2016 4:00-6:00 pm: Continued looking for variables that could identify accelerators from their websites. Searched through numerous different websites of accelerators obtained from our current databases.

11/2/2016 2:00-4:00 pm: Continued combing through websites of numerous accelerators, well-known and other, in the hopes of finding identifying variables.

11/3/2016 4:00-6:00 pm: Finalized my list of variables that could be used to distinguish the websites of accelerators. Slightly re-arranged our list of accelerator databases in order of relevance.

11/7/2016 2:00-5:00 pm: Began compiling the list of all accelerators. Created a new TextPad document with information from a new database.

11/8/2016 4:00-6:00 pm: Worked with Shrey and Ben in order to compile all of our accelerator databases into one long list on Textpad.

11/9/2016 2:00-5:00 pm: Continued formulating a database for all accelerators and all of the available info given.

11/10/2016 4:00-6:00 pm: Worked with Shrey and Peter in order to develop a crawler for f6s. Matthew Ringheanu Work Logs (log page)