Minh Le (Work Log)
Revision as of 17:21, 20 June 2018 by Leminh.ams (talk | contribs)
Summer 2018
2018-06-21:
- TODO: Move the crawler stuff to the folder
2018-06-20:
- Set up Work Log page.
- Edited Profile page with more information.
- Created project page: Accelerator Demo Day.
- Made new project folder at E:\McNair\Projects\Accelerator Demo Day.
- Read through old projects and copied scripts over as well as cleaned things up.
- Created movelog.txt to track these moving details.
2018-06-19: More SQL. Talked with Ed and received my project (Demo Day Crawler).
2018-06-18: Set up RDPs, Slacks, Profile page and learned about SQL.