Difference between revisions of "Albert Nabiullin (Work Log)"
Line 21: | Line 21: | ||
09/19/2016 14:57-16:32 - Read primary and secondary sources for [[High-Skilled Visas for Entrepreneurs (Blog Post)]]. Created framework for blog post and linked draft. | 09/19/2016 14:57-16:32 - Read primary and secondary sources for [[High-Skilled Visas for Entrepreneurs (Blog Post)]]. Created framework for blog post and linked draft. | ||
+ | |||
+ | 09/20/2016 12:50 -xx:xx - |
Revision as of 12:54, 20 September 2016
Albert Nabiullin Work Logs (log page)
08/31/2016 15:05-16:45 - Set Up Personal & Work Log Pages
09/01/2016 12:47-15:06 - Finish page setup. Comb through Wiki for page restructuring
09/06/2016 12:45-15:20 - Continue wiki combing. Social media engagement. Management meeting.
09/07/2016 15:08-17:01 - Restructure properties for deliverables. Unsuccessfully edited Form:McNair Staff (new properties aren't added to table, get Harsh to help). Brainstormed for new projects.
09/08/2016 13:07-16:25 - Connecting Accenture and McNair (Need to meet with BIPP Development people if event happens). Corresponding with patent team about future projects.
09/09/2016 16:08-17:35 - Moved hardware. Contacted Marcela for future meeting between the summer patent team and the fall patent team.
09/12/2016 15:07-17:11 - Met with Avesh to start blog post on regulation deliverable. Blog post currently in draft stage.
09/14/2016 15:12-17:11 - Brainstormed new blog post on entrepreneurship visas. Social media engagement; scheduled 2 tweets on patents and visas.
09/15/2016 12:52-17:30 - Started High-Skilled Visas for Entrepreneurs (Blog Post). Ran tweets and increased followers.
09/19/2016 14:57-16:32 - Read primary and secondary sources for High-Skilled Visas for Entrepreneurs (Blog Post). Created framework for blog post and linked draft.
09/20/2016 12:50 -xx:xx -