Difference between revisions of "Oliver Chang (Work Log)"

From edegan.com
Jump to navigation Jump to search
 
(38 intermediate revisions by 2 users not shown)
Line 1: Line 1:
[[Oliver Chang]] [[Work Logs]]
+
''Projects'':
[[Oliver Chang (Work Log)|(logpage)]]
 
 
 
 
 
'''Current Primary Project''': [[Reproducible_Patent_Data|Reproducible Patent Data]]
 
 
 
''Other Projects'':
 
  
 +
* [[PostGIS_Installation|PostGIS Installation]]
 +
* [[Reproducible_Patent_Data|Reproducible Patent Data]]
 +
* [[Patent_Validity_Ideas_for_ML|Predictive Patent Validity Machine Learning Ideas]]
 
* [[Equivalent_XPath_and_APS_Queries|Equivalent XPath and APS Queries]]
 
* [[Equivalent_XPath_and_APS_Queries|Equivalent XPath and APS Queries]]
 
* [[US_Address_Verification|US Address Verification]]
 
* [[US_Address_Verification|US Address Verification]]
 
+
* [[GPU_Build|GPU Computer Build]]
 +
* [[Parallel_Enclosing_Circle_Algorithm|Parallel Enclosing Circle Algorithm]]
 +
* [[Python_on_the_RDP|Python on the RDP]]
 +
* [[Hierarchical_Clustering|Hierarchical Clustering]]
  
 
''Uploads'':
 
''Uploads'':
  
 +
* [http://mcnair.bakerinstitute.org/wiki/File:Path-example.PNG File:Path-example.PNG]
 +
** Screenshot of how to set the path environment variable
 
* [[File:PADX-File-Description-v2_Hague.pdf]]
 
* [[File:PADX-File-Description-v2_Hague.pdf]]
 +
** Describes patent kind codes (notably, what the hell X0 represents)
 
* [[File:PatentFullTextAPSDoc_GreenBook_pgs13-22.pdf]]
 
* [[File:PatentFullTextAPSDoc_GreenBook_pgs13-22.pdf]]
 +
** Describes the fields in APS, their supposed character lengths, and if they are required/optional
 +
* [[File:Aps-wku-modulus11.pdf]]
 +
** Describes the layout of the check digit on magnetic tape
 +
* [[File:Mod-11-algorithm.pdf]]
 +
** Describes the algorithm used to calculate the check digit
 +
 +
===Fall 2017===
 +
<onlyinclude>
 +
 +
[[Oliver Chang]] [[Work Logs]] [[Oliver Chang (Work Log)|(log page)]]
 +
 +
2017-12-02: communicated results of running ECA on 2 stddev table (not the error source); update db and web server software; check if scipy elision is ECA bug (it is not)
 +
 +
2017-12-01: re-tasked Kyran with the hierarchical clustering algorithm implementation; create 2 standard deviations tables; freed up DB space
 +
 +
2017-11-30: stub out implementation, add parsing code and mapping code...just need the meat of the algorithm now
 +
 +
2017-11-27: documentation & bug finding on the parallel enclosing circle project; research hierarchical linkage approach
 +
 +
2017-11-14: hand off work on xpathing to Shelby; walked through some program design decisions
 +
 +
2017-11-13: finish javadoc of common/ and some trickier parts about downloading; added descriptions, results to one-off java/python scripts so that they actually make sense in context
 +
 +
2017-11-10: add javadoc documentation to patent reproducibility project after forgetting half of the stuff myself
 +
 +
2017-10-25: start ingestion of application xml files and deal with all the bugs which accompany that
 +
 +
2017-10-21: create xml explorer script to mass-inspect xpaths (can be found at <code>E:\McNair\Projects\SimplerPatentData\src\main\java\org\bakerinstitute\mcnair\xml_schema_explorer</code>)
 +
 +
2017-10-20: re-run assignment import, review xpaths
 +
 +
2017-10-19: repopulate patents database and create spreadsheet of assignment equivalencies
 +
 +
2017-10-11: add issues to work on to the PECA wiki page; cleanup PECA git repo; start patent application code from granted patent code and start customizing to new domain
 +
 +
2017-10-03: troubleshoot vc_circles.py and make command line interface a little nicer
 +
 +
2017-10-02: discuss mapping strategies & investigate missing eca data
 +
 +
2017-09-23: make Project/OliverLovesCircles usable and add initial splitting ability
 +
 +
2017-09-22: goal setting & server debugging & meet with Yang
 +
</onlyinclude>
 +
 +
===Summer 2017===
 +
 +
2017-08-04: setup parallel instance python framework for job reporting; begin test run
 +
 +
2017-08-02: finish up some documentation of the code and for the wiki
 +
 +
2017-08-01: discuss with Abhi & Ed about alternatives to Java port because of algorithmic constants that would be hard to port; run test batches on python with addition of equality operators and convergence early stopping
 +
 +
2017-07-31: sketch out parallel enclosing circle algorithm
 +
 +
2017-07-18: field questions and data cleanup questions from Kerda & Joe & Adrian
 +
 +
2017-07-19: try to remove duplicated records (esp. those with empty titles) which are preventing the addition of a unique constraint
 +
 +
2017-07-18: run correspondent join on properties and correspondents table to match previous project; sync with Adrian and Abhi
 +
 +
2017-07-17: redo db operations after cleaning up granted patent number bugs
 +
 +
2017-07-13: powwow about parallelizing Enclosing Circle Algorithm; sketch out what to do for the rest of the summer; work more on joins
 +
 +
2017-07-12: generate some example data illustrating the difficulty of joining different tables
 +
 +
2017-07-11: track down some bugs that happen very rarely and were missed in the initial qa phase
 +
 +
2017-07-07: catch up on documentation
 +
 +
2017-07-06: try (unsuccessfully) to understand docid mapping...create exploration scripts
 +
 +
2017-07-05: add invention title to proper grouping of assignment properties; optimize XML parsing
 +
 +
2017-06-30: powwow with James, Abhi, Ed about optimization issues; discuss document ids, X0 etc with Ed; pinpoint issues with APS doc numbers (see Repro Pat Dat#Gotchas) for more info
 +
 +
2017-06-29: add logging of copy commands, more chattiness to scripts, debug assignment data failure
 +
 +
2017-06-28: create examples for expansion to plant, reissue, design patent collection; start optimizing xml
 +
 +
2017-06-27: write SQL to replicate assignees, extract postcodes for ongoing projects
 +
 +
2017-06-26: speedup code, abstract in-memory file splitters to avoid repetition and some weird edge cases
 +
 +
2017-06-25: create mappings for APS, assignment properties, XML 2.5 for data import; run data imports for granted data
 +
 +
2017-06-23: cleanup hacky models with a better set of abstractions; cleanup IDE warnings; redefine patent-address mapping
 +
 +
2017-06-22: create postcode<->patent table
 +
 +
2017-06-29: document granted patent queries and equivalencies
 +
 +
2017-06-20: sketch out APS driver; discuss patent id problem; further document with evidence the zipcode data validity
 +
 +
2017-06-19: skim address regular expressions; cursory investigation of patent table
 +
 +
2017-06-16: create method of getting all data into the database, whether it likes it or not; copy over assignments, granted data using new scheme
 +
 +
2017-06-15: add more robust error reporting, fix race conditions; build out assignment driver; build out fee event driver; add error logging
 +
 +
2017-06-14: migrate bulk inserts to copy command; refresh on address data and start in on that; convert processor to multi-threaded application
 +
 +
2017-06-13: spot check SQL tables; fix broken final case endlessly looping; investigate smarter insert methods
 +
 +
2017-06-12: add XML printer, use it to inspect applications; extend BaseScraper to fetch patent application data; add applications documentation to my project page; add CREATE of other tables
 +
 +
2017-06-08: add foreign key inserts; create pretty printer for XML analysis
 +
 +
2017-06-07: finalize DB abstraction layer; migrate code to bulk inserts; upgrade webserver software and do optimization on RDP postgres with Ed
 +
 +
2017-06-06: add jdbc; create basic schema; add db interaction; schedule meeting for later in the week
 +
 +
2017-06-05: look into postgresql; refersh on postgis; add some notes to the Enclosing Circle Algorithm page
 +
 +
2017-06-01: add RDP git remote; add more documentation to wiki page; refactor downloader scripts; start creation of tooling for interacting with data
 +
 +
2017-05-31: finish copy-pasting attributes into the wiki page; retroactively fill out work log; meet with Ed to discuss next steps
 +
 +
2017-05-30: update documentation on wiki, restructure large binary files to have more hierarchy instead of a flat listing at the root
  
 +
2017-05-29: expand to APS; expand to raw assignment data
  
 +
2017-05-27: expand to maintenance fee data
  
== Day-by-Day (in reverse chronological order) ==
+
2017-05-26: create models, translate <code>xmlparser*.pl</code> file into Java; start using builder pattern
  
=== June 2017 ===
+
2017-05-25: sketch out OO design of project; download bulk data
  
* June 30: powwow with James, Abhi, Ed about optimization issues; discuss document ids, X0 etc with Ed; pinpoint issues with APS doc numbers (see Repro Pat Dat#Gotchas) for more info
+
2017-05-24: move wiki pages around; start git repository for project
* June 29: add logging of copy commands, more chattiness to scripts, debug assignment data failure
 
* June 28: create examples for expansion to plant, reissue, design patent collection; start optimizing xml
 
* June 27: write SQL to replicate assignees, extract postcodes for ongoing projects
 
* June 26: speedup code, abstract in-memory file splitters to avoid repetition and some weird edge cases
 
* June 25: create mappings for APS, assignment properties, XML 2.5 for data import; run data imports for granted data
 
* June 23: cleanup hacky models with a better set of abstractions; cleanup IDE warnings; redefine patent-address mapping
 
* June 22: create postcode<->patent table
 
* June 21: document granted patent queries and equivalencies
 
* June 20: sketch out APS driver; discuss patent id problem; further document with evidence the zipcode data validity
 
* June 19: skim address regular expressions; cursory investigation of patent table
 
* June 16: create method of getting all data into the database, whether it likes it or not; copy over assignments, granted data using new scheme
 
* June 15: add more robust error reporting, fix race conditions; build out assignment driver; build out fee event driver; add error logging
 
* June 14: migrate bulk inserts to copy command; refresh on address data and start in on that; convert processor to multi-threaded application
 
* June 13: spot check SQL tables; fix broken final case endlessly looping; investigate smarter insert methods
 
* June 12: add XML printer, use it to inspect applications; extend BaseScraper to fetch patent application data; add applications documentation to my project page; add CREATE of other tables
 
* June 8: add foreign key inserts; create pretty printer for XML analysis
 
* June 7: finalize DB abstraction layer; migrate code to bulk inserts; upgrade webserver software and do optimization on RDP postgres with Ed
 
* June 6: add jdbc; create basic schema; add db interaction; schedule meeting for later in the week
 
* June 5: look into postgresql; refersh on postgis; add some notes to the Enclosing Circle Algorithm page
 
* June 1: add RDP git remote; add more documentation to wiki page; refactor downloader scripts; start creation of tooling for interacting with data
 
  
=== May 2017 ===
+
2017-05-21: discuss technical details of previous work with Ed
  
* May 31: finish copy-pasting attributes into the wiki page; retroactively fill out work log; meet with Ed to discuss next steps
+
2017-05-08: cleanup dead links on wiki and start reading about previous work; discuss current project status with Ed
* May 30: update documentation on wiki, restructure large binary files to have more hierarchy instead of a flat listing at the root
 
* May 29: expand to APS; expand to raw assignment data
 
* May 27: expand to maintenance fee data
 
* May 26: create models, translate <code>xmlparser*.pl</code> file into Java; start using builder pattern
 
* May 25: sketch out OO design of project; download bulk data
 
* May 24: move wiki pages around; start git repository for project
 
* May 21: discuss technical details of previous work with Ed
 
* May 8: cleanup dead links on wiki and start reading about previous work; discuss current project status with Ed
 
* May 4: setup wiki account, rdp account, database training
 
  
 +
2017-05-04: setup wiki account, rdp account, database training
  
 
[[Category:Work Log]]
 
[[Category:Work Log]]

Latest revision as of 22:19, 2 December 2017

Projects:

Uploads:

Fall 2017

Oliver Chang Work Logs (log page)

2017-12-02: communicated results of running ECA on 2 stddev table (not the error source); update db and web server software; check if scipy elision is ECA bug (it is not)

2017-12-01: re-tasked Kyran with the hierarchical clustering algorithm implementation; create 2 standard deviations tables; freed up DB space

2017-11-30: stub out implementation, add parsing code and mapping code...just need the meat of the algorithm now

2017-11-27: documentation & bug finding on the parallel enclosing circle project; research hierarchical linkage approach

2017-11-14: hand off work on xpathing to Shelby; walked through some program design decisions

2017-11-13: finish javadoc of common/ and some trickier parts about downloading; added descriptions, results to one-off java/python scripts so that they actually make sense in context

2017-11-10: add javadoc documentation to patent reproducibility project after forgetting half of the stuff myself

2017-10-25: start ingestion of application xml files and deal with all the bugs which accompany that

2017-10-21: create xml explorer script to mass-inspect xpaths (can be found at E:\McNair\Projects\SimplerPatentData\src\main\java\org\bakerinstitute\mcnair\xml_schema_explorer)

2017-10-20: re-run assignment import, review xpaths

2017-10-19: repopulate patents database and create spreadsheet of assignment equivalencies

2017-10-11: add issues to work on to the PECA wiki page; cleanup PECA git repo; start patent application code from granted patent code and start customizing to new domain

2017-10-03: troubleshoot vc_circles.py and make command line interface a little nicer

2017-10-02: discuss mapping strategies & investigate missing eca data

2017-09-23: make Project/OliverLovesCircles usable and add initial splitting ability

2017-09-22: goal setting & server debugging & meet with Yang


Summer 2017

2017-08-04: setup parallel instance python framework for job reporting; begin test run

2017-08-02: finish up some documentation of the code and for the wiki

2017-08-01: discuss with Abhi & Ed about alternatives to Java port because of algorithmic constants that would be hard to port; run test batches on python with addition of equality operators and convergence early stopping

2017-07-31: sketch out parallel enclosing circle algorithm

2017-07-18: field questions and data cleanup questions from Kerda & Joe & Adrian

2017-07-19: try to remove duplicated records (esp. those with empty titles) which are preventing the addition of a unique constraint

2017-07-18: run correspondent join on properties and correspondents table to match previous project; sync with Adrian and Abhi

2017-07-17: redo db operations after cleaning up granted patent number bugs

2017-07-13: powwow about parallelizing Enclosing Circle Algorithm; sketch out what to do for the rest of the summer; work more on joins

2017-07-12: generate some example data illustrating the difficulty of joining different tables

2017-07-11: track down some bugs that happen very rarely and were missed in the initial qa phase

2017-07-07: catch up on documentation

2017-07-06: try (unsuccessfully) to understand docid mapping...create exploration scripts

2017-07-05: add invention title to proper grouping of assignment properties; optimize XML parsing

2017-06-30: powwow with James, Abhi, Ed about optimization issues; discuss document ids, X0 etc with Ed; pinpoint issues with APS doc numbers (see Repro Pat Dat#Gotchas) for more info

2017-06-29: add logging of copy commands, more chattiness to scripts, debug assignment data failure

2017-06-28: create examples for expansion to plant, reissue, design patent collection; start optimizing xml

2017-06-27: write SQL to replicate assignees, extract postcodes for ongoing projects

2017-06-26: speedup code, abstract in-memory file splitters to avoid repetition and some weird edge cases

2017-06-25: create mappings for APS, assignment properties, XML 2.5 for data import; run data imports for granted data

2017-06-23: cleanup hacky models with a better set of abstractions; cleanup IDE warnings; redefine patent-address mapping

2017-06-22: create postcode<->patent table

2017-06-29: document granted patent queries and equivalencies

2017-06-20: sketch out APS driver; discuss patent id problem; further document with evidence the zipcode data validity

2017-06-19: skim address regular expressions; cursory investigation of patent table

2017-06-16: create method of getting all data into the database, whether it likes it or not; copy over assignments, granted data using new scheme

2017-06-15: add more robust error reporting, fix race conditions; build out assignment driver; build out fee event driver; add error logging

2017-06-14: migrate bulk inserts to copy command; refresh on address data and start in on that; convert processor to multi-threaded application

2017-06-13: spot check SQL tables; fix broken final case endlessly looping; investigate smarter insert methods

2017-06-12: add XML printer, use it to inspect applications; extend BaseScraper to fetch patent application data; add applications documentation to my project page; add CREATE of other tables

2017-06-08: add foreign key inserts; create pretty printer for XML analysis

2017-06-07: finalize DB abstraction layer; migrate code to bulk inserts; upgrade webserver software and do optimization on RDP postgres with Ed

2017-06-06: add jdbc; create basic schema; add db interaction; schedule meeting for later in the week

2017-06-05: look into postgresql; refersh on postgis; add some notes to the Enclosing Circle Algorithm page

2017-06-01: add RDP git remote; add more documentation to wiki page; refactor downloader scripts; start creation of tooling for interacting with data

2017-05-31: finish copy-pasting attributes into the wiki page; retroactively fill out work log; meet with Ed to discuss next steps

2017-05-30: update documentation on wiki, restructure large binary files to have more hierarchy instead of a flat listing at the root

2017-05-29: expand to APS; expand to raw assignment data

2017-05-27: expand to maintenance fee data

2017-05-26: create models, translate xmlparser*.pl file into Java; start using builder pattern

2017-05-25: sketch out OO design of project; download bulk data

2017-05-24: move wiki pages around; start git repository for project

2017-05-21: discuss technical details of previous work with Ed

2017-05-08: cleanup dead links on wiki and start reading about previous work; discuss current project status with Ed

2017-05-04: setup wiki account, rdp account, database training