Difference between revisions of "Kyran Adams (Work Log)"
Jump to navigation
Jump to search
Line 10: | Line 10: | ||
10/30/2017 - Rechecked parts compatibility, switched PSU and case | 10/30/2017 - Rechecked parts compatibility, switched PSU and case | ||
+ | |||
+ | 11/1/2017 - Familiarized with [[http://mcnair.bakerinstitute.org/wiki/Parallel_Enclosing_Circle_Algorithm Enclosing Circle Algorithm]] to find St. Louis bug |
Revision as of 14:22, 1 November 2017
Kyran Adams Work Logs (log page)
10/20/2017 - Set up a wiki page
10/23/2017 - Started researching GPU Build. Researched the practical differences between single vs. multiple GPUs.
10/25/2017 - Worked on the partpicker for the dual GPU build.
10/27/2017 - Decided on dual GPU system, switched motherboard and CPU
10/30/2017 - Rechecked parts compatibility, switched PSU and case
11/1/2017 - Familiarized with [Enclosing Circle Algorithm] to find St. Louis bug