Difference between revisions of "Oliver Chang (Work Log)"
Jump to navigation
Jump to search
Line 10: | Line 10: | ||
=== June 2017 === | === June 2017 === | ||
+ | * June 8: add foreign key inserts; create pretty printer for XML analysis | ||
+ | * June 7: finalize DB abstraction layer; migrate code to bulk inserts; upgrade webserver software and do optimization on RDP postgres with Ed | ||
* June 6: add jdbc; create basic schema; add db interaction; schedule meeting for later in the week | * June 6: add jdbc; create basic schema; add db interaction; schedule meeting for later in the week | ||
* June 5: look into postgresql; refersh on postgis; add some notes to the Enclosing Circle Algorithm page | * June 5: look into postgresql; refersh on postgis; add some notes to the Enclosing Circle Algorithm page |
Revision as of 10:17, 9 June 2017
Oliver Chang Work Logs (logpage)
Current Primary Project: Reproducible Patent Data
Day-by-Day (in reverse chronological order)
June 2017
- June 8: add foreign key inserts; create pretty printer for XML analysis
- June 7: finalize DB abstraction layer; migrate code to bulk inserts; upgrade webserver software and do optimization on RDP postgres with Ed
- June 6: add jdbc; create basic schema; add db interaction; schedule meeting for later in the week
- June 5: look into postgresql; refersh on postgis; add some notes to the Enclosing Circle Algorithm page
- June 1: add RDP git remote; add more documentation to wiki page; refactor downloader scripts; start creation of tooling for interacting with data
May 2017
- May 31: finish copy-pasting attributes into the wiki page; retroactively fill out work log; meet with Ed to discuss next steps
- May 30: update documentation on wiki, restructure large binary files to have more hierarchy instead of a flat listing at the root
- May 29: expand to APS; expand to raw assignment data
- May 27: expand to maintenance fee data
- May 26: create models, translate
xmlparser*.pl
file into Java; start using builder pattern - May 25: sketch out OO design of project; download bulk data
- May 24: move wiki pages around; start git repository for project
- May 21: discuss technical details of previous work with Ed
- May 8: cleanup dead links on wiki and start reading about previous work; discuss current project status with Ed
- May 4: setup wiki account, rdp account, database training