9/29 3pm-5:45pm completed pulling/normalizing data, still need to load data using SQL code into tables, which is on {{Retrieving US VC Data From SDC}} 9/28 2:30-6pm loaded met with Ed, worked on pulling firm and branch office tables data from SDC
9/22 3pm-5pm join portcos and funds; and begin literature review of matching games/venture capital (located in "Matching Entreps to VC's project folder" on E drive."