Difference between revisions of "Connor Rothschild (Work Log)"
Line 7: | Line 7: | ||
06/21/2018 - Began manually editing entries in Accelerator Master Variable List. | 06/21/2018 - Began manually editing entries in Accelerator Master Variable List. | ||
Reached out to Grace and Maxine and sent them the necessary sheets/txt files so they could begin on their Crunchbase project. | Reached out to Grace and Maxine and sent them the necessary sheets/txt files so they could begin on their Crunchbase project. | ||
− | I also made these graphics to better represent what our collaborative work would look like, and what the final project would include | + | |
+ | I also made these graphics to better represent what our collaborative work would look like, and what the final project would include: | ||
https://docs.google.com/document/d/13Mb7lOLydm9r-ENYxSlZJVGgY9wxClATR6Hy8F9YK1Y/edit?usp=sharing | https://docs.google.com/document/d/13Mb7lOLydm9r-ENYxSlZJVGgY9wxClATR6Hy8F9YK1Y/edit?usp=sharing | ||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
06/20/2018 - Talked with Ed about project details. Began looking through the Accelerator Master List to better understand project description. Sent Grace and Maxine the relevant company names listed in the Accelerator Master Spreadsheet so they could begin using their relevant parsers and tools to sort through data. | 06/20/2018 - Talked with Ed about project details. Began looking through the Accelerator Master List to better understand project description. Sent Grace and Maxine the relevant company names listed in the Accelerator Master Spreadsheet so they could begin using their relevant parsers and tools to sort through data. |
Revision as of 11:25, 22 June 2018
Summer 2018
06/22/2018 - Finished going through Accelerator Master Variable List to refine industry classification and update addresses/accelerator statuses.
06/21/2018 - Began manually editing entries in Accelerator Master Variable List. Reached out to Grace and Maxine and sent them the necessary sheets/txt files so they could begin on their Crunchbase project.
I also made these graphics to better represent what our collaborative work would look like, and what the final project would include:
https://docs.google.com/document/d/13Mb7lOLydm9r-ENYxSlZJVGgY9wxClATR6Hy8F9YK1Y/edit?usp=sharing
06/20/2018 - Talked with Ed about project details. Began looking through the Accelerator Master List to better understand project description. Sent Grace and Maxine the relevant company names listed in the Accelerator Master Spreadsheet so they could begin using their relevant parsers and tools to sort through data.
06/19/2018 - Set up work stations on balcony, trained
06/18/2018 - Trained, met other interns